Views: 7 Author: Site Editor Publish Time: 2024-05-27 Origin: Site
Setting up the circuits in the Hydraulic section for initial system setup
1 Install the pear links to the ears on the hook
2 Turn on the Top Drive power
3 Rotate the counterbalance mode valve from the RUN position to the RIG-UP position
4 When the cylinders reach the end of the stroke, slide the cylinder clevis over the pear link and install the cylinder clevis pin
5 After securing the counterbalance cylinder to the pear link, rotate the counterbalance mode valve to the RUN position
6 Adjust PCC clockwise to raise the pressure at test port CB until the bail just begins to lift off of the block
7 Reduce the pressure slowly (25 psi) to allow pressure to stabilize
CYLINDER ASSEMBLY,COUNTER BALANCE OEM #110703 EVERGROW #166055